At the Hub Dassenplein office building in Sittard, a comprehensive renovation of RoyWorks' new office space was undertaken. The goal was to unify various old flooring types, including tile and sand-cement screeds, into a single cohesive surface. The challenge involved leveling the different floor sections and rerouting the heating pipes running just below the surface.
The floors were first degreased and sanded, then primed with UZIN PE 280 Carbon Primer and UZIN PE 360. The open slots were repaired with UZIN NC 182. The entire floor was leveled to a thickness of 4 mm using UZIN NC 580 to create a smooth surface. Finally, a combination of two colors of PVC was bonded with UZIN KE 66.
Data
Building type | FusionTec |
---|---|
Area | 330 sqm |
Country | Nederland |
The FusionTec levelling compound UZIN NC 580, along with complementary UZIN products, provided the ideal foundation for this office renovation, ensuring precision leveling and optimal adhesion for the PVC flooring. The result is a robust and seamless workspace that fulfills the demanding requirements of contemporary office environments.