UZIN RK 37 1-Component PUR Injection Adhesive

Hard, shear-resistant and quick-setting adhesive for repair work

  • excellent penetration
  • good filling capacities

Hints

As from 24 August 2023 adequate training is required before industrial or professional use.
Further information on the training courses can be found here:

https://int.uzin-utz.com/news-events/diisocyanates-certification

Applications

Main application area:

  • repair hollow areas
  • adhesion of single wood flooring elements or small partial areas

Technical data

*At 20 °C and 65% relative humidity.
Packaging

plastic bottle with nozzle

Pack size

250 g

Shelf life

min. 6 months

Color

yellowish - transparent

Consumption

depending on application

Open time

approx. 20 minutes*

Minimum application temperature

15 °C at ground level

Loadable

after approx. 6 hours*

Final strength

after 1 - 2 days*

Ordering information

Article Article number Packsize Shipping unit
UZIN RK 37 13663 250 g
Box :
2
Pallet :
400

Quality seals and badges

Icon_EMICODE EC1 PLUS_GB

Installation systems for screeds, floors and wood flooring

Machinery and special tools for substrate preparation and installation of floor coverings

Complete product range for installation, renovation and maintenance of wood flooring

Resin and cementitious floor finishes combining performance and design

Installation systems for tiling and natural stone

High quality painting, plastering and drywalling tools